The design for the “Wall” installation was very simple and proved effective:
a concrete coated plywood and timber facade attached to a large, freestanding scaffold support structure, weighted down with water ballast tanks.
NB The drawings below show the structure designed and built specifically for the courtyard of St James’s Church, Piccadilly, London.